{"id":2248,"date":"2021-06-08T23:14:30","date_gmt":"2021-06-08T23:14:30","guid":{"rendered":"http:\/\/westlakeconsultants.com\/site\/?p=2248"},"modified":"2021-08-18T16:15:02","modified_gmt":"2021-08-18T16:15:02","slug":"celebrating-lake-oswego-tigard-water-system","status":"publish","type":"post","link":"http:\/\/westlakeconsultants.com\/site\/celebrating-lake-oswego-tigard-water-system\/","title":{"rendered":"Celebrating Lake Oswego-Tigard Water System"},"content":{"rendered":"\n<p>Today marks 5 years since the completion of the $254 million Lake Oswego Tigard Water Partnership program.<\/p>\n\n\n\n<p>The project began in 2008, when the City of Lake Oswego and the City of Tigard decided to partner together to build a new water system. The massive project included the construction of a river intake pump station on the Clackamas River, 10 miles of pipeline, a pump station in Tigard, a storage reservoir in Lake Oswego, and a drinking water treatment plant in West Linn.<\/p>\n\n\n\n<figure class=\"wp-block-gallery aligncenter columns-3 is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\"><ul class=\"blocks-gallery-grid\"><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"http:\/\/westlakeconsultants.com\/site\/wp-content\/uploads\/LOTW_OswegoLake-1-1024x768.jpg\" alt=\"\" data-id=\"2257\" data-full-url=\"http:\/\/westlakeconsultants.com\/site\/wp-content\/uploads\/LOTW_OswegoLake-1.jpg\" data-link=\"http:\/\/westlakeconsultants.com\/site\/?attachment_id=2257\" class=\"wp-image-2257\" srcset=\"http:\/\/westlakeconsultants.com\/site\/wp-content\/uploads\/LOTW_OswegoLake-1-1024x768.jpg 1024w, http:\/\/westlakeconsultants.com\/site\/wp-content\/uploads\/LOTW_OswegoLake-1-300x225.jpg 300w, http:\/\/westlakeconsultants.com\/site\/wp-content\/uploads\/LOTW_OswegoLake-1-768x576.jpg 768w, http:\/\/westlakeconsultants.com\/site\/wp-content\/uploads\/LOTW_OswegoLake-1-1536x1152.jpg 1536w, http:\/\/westlakeconsultants.com\/site\/wp-content\/uploads\/LOTW_OswegoLake-1.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"663\" src=\"http:\/\/westlakeconsultants.com\/site\/wp-content\/uploads\/facilities-map_summer2017-1024x663.jpg\" alt=\"\" data-id=\"2258\" data-full-url=\"http:\/\/westlakeconsultants.com\/site\/wp-content\/uploads\/facilities-map_summer2017-scaled.jpg\" data-link=\"http:\/\/westlakeconsultants.com\/site\/?attachment_id=2258\" class=\"wp-image-2258\" srcset=\"http:\/\/westlakeconsultants.com\/site\/wp-content\/uploads\/facilities-map_summer2017-1024x663.jpg 1024w, http:\/\/westlakeconsultants.com\/site\/wp-content\/uploads\/facilities-map_summer2017-300x194.jpg 300w, http:\/\/westlakeconsultants.com\/site\/wp-content\/uploads\/facilities-map_summer2017-768x497.jpg 768w, http:\/\/westlakeconsultants.com\/site\/wp-content\/uploads\/facilities-map_summer2017-1536x994.jpg 1536w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><img decoding=\"async\" src=\"http:\/\/westlakeconsultants.com\/site\/wp-content\/uploads\/2010b-05-13-003.jpg\" alt=\"\" data-id=\"2259\" data-link=\"http:\/\/westlakeconsultants.com\/site\/?attachment_id=2259\" class=\"wp-image-2259\"\/><\/figure><\/li><\/ul><\/figure>\n\n\n\n<p>The project took nearly 9 years to complete and features state-of-the-art water filtration systems, was designed to withstand a major seismic event, and includes many green features to increase sustainability.<\/p>\n\n\n\n<p>From 2010-2018, Westlake performed surveying for the entire 10-mile route from the new raw water intake facility on the Clackamas River, through Gladstone and unincorporated Clackamas County, under the Willamette River to West Linn, and through to Tigard.<\/p>\n\n\n\n<p>WCI provided surveying, as a subconsultant to Brown &amp; Caldwell, for preliminary alignment and final design of the water transmission routes and storage water facilities.<\/p>\n\n\n\n<p>Additional scope tasks included resolution of right-of-way along the entire route, topographic surveying for the water treatment plant in West Linn and assisting the design team with cost control through collaboration and consultation.<\/p>\n\n\n\n<p>Learn more about the project by clicking <a href=\"https:\/\/www.youtube.com\/watch?v=Lj2ntxZlHXY\" data-type=\"URL\" data-id=\"https:\/\/www.youtube.com\/watch?v=Lj2ntxZlHXY\" target=\"_blank\" rel=\"noreferrer noopener\">here<\/a>. <\/p>\n","protected":false},"excerpt":{"rendered":"<p>Today marks 5 years since the completion of the $254 million Lake Oswego Tigard Water Partnership program. The project began in 2008, when the City of Lake Oswego and the City of Tigard decided to partner together to build a new water system. The massive project included the construction of a river intake pump station [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[64],"tags":[],"class_list":["post-2248","post","type-post","status-publish","format-standard","hentry","category-land-survey"],"acf":[],"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"http:\/\/westlakeconsultants.com\/site\/wp-json\/wp\/v2\/posts\/2248","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/westlakeconsultants.com\/site\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/westlakeconsultants.com\/site\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/westlakeconsultants.com\/site\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/westlakeconsultants.com\/site\/wp-json\/wp\/v2\/comments?post=2248"}],"version-history":[{"count":8,"href":"http:\/\/westlakeconsultants.com\/site\/wp-json\/wp\/v2\/posts\/2248\/revisions"}],"predecessor-version":[{"id":2268,"href":"http:\/\/westlakeconsultants.com\/site\/wp-json\/wp\/v2\/posts\/2248\/revisions\/2268"}],"wp:attachment":[{"href":"http:\/\/westlakeconsultants.com\/site\/wp-json\/wp\/v2\/media?parent=2248"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/westlakeconsultants.com\/site\/wp-json\/wp\/v2\/categories?post=2248"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/westlakeconsultants.com\/site\/wp-json\/wp\/v2\/tags?post=2248"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}